Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the header-footer-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/43.154.79.65_8010/wp-includes/functions.php on line 6121
Qingdao LNG Receiving Station – Over Power Energy

Over Power Energy

Qingdao LNG Receiving Station

Qingdao LNG Receiving Station
Green lines background-1

The annual transfer capacity of LNG is 11 million tons. The total land area is 879 mu, the total sea area used is 262.66 hectares, and the total investment is approximately 11.5 billion yuan. The receiving station was constructed in three phases successively and was fully put into operation in 2023.

If a cold energy air separation unit is constructed relying on the reserved land on the west side of Qingdao LNG Receiving Station (with an area of 37 mu), and the design of a typical scale unit is adopted, after the project is completed, it can achieve a daily production of 715.5 tons of liquid products (350 tons of liquid oxygen, 350 tons of liquid nitrogen, and 15.5 tons of liquid argon), and the utilization amount of LNG cold energy is approximately 80 tons per hour.

Green lines background-2
References-Contact

Do you want to know if our project is worth investing in?

We would be pleased to support you in the preparation of a feasibility study. This includes a profitability calculation based on your substrate mix, gas composition, vessel volumes, and energy sources used.